Total Quality or
Performance Appraisal: Choose One
|
National Productivity Review
p.349 (15)
Summer 1993 v12 n3
Scholtes, Peter R.
Many teachers of total quality, following the lead of W. Edwards Deming, suggest that
TQM and performance appraisal are incompatible. Indeed, Deming lists "evaluation of
performance, merit rating and annual review" as the third of his "Seven Deadly
Diseases." Why can't TQM and performance appraisal co-exist? At the center of the
case against performance appraisal are the fundamental values and principles of TQM. TQM
requires customer-consciousness, systems-thinking, an understanding of variation, an
appreciation of teamwork, a mastery of improvement methods, and an understanding of the
process of personal motivation and learning. These very requirements of TQM are subverted
by performance appraisal. TQM requires us to understand, control, and improve processes
for the benefit of the customer. Performance appraisal aims at controlling an individual's
behavior to the satisfaction of his or her manager. The two approaches represent a
fundamental choice for leaders: one or the other; not both.
While TQM-bashing has recently become fashionable in U.S. business periodicals, the
total quality movement is alive and well. Companies like Harley Davidson, Motorola, and
Xerox--who understand TQM--aren't bashing total quality. And one doesn't hear of the
demise of Japan's total quality control efforts. What we are witnessing is the American
appetite for fads. Those who never understood quality in the first place and trivialized
it in the second place are now declaring it dead.
Total quality is a compelling and simple approach to management. When intelligently
applied, the basic principles of TQM will, however, fundamentally change the way a
conventional manager thinks about the nature of work and the purpose of leadership. This
fundamental change requires managers to relinquish the old set of premises--the old
paradigm--and struggle to understand, internalize and apply a new approach--what Brian
Joiner of Joiner Associates calls fourth-generation management. Deming says, "What is
required is nothing less than the transformation of Western management." Many
managers have learned the rhetoric of total quality and adopted programs to apply TQM to
their companies. But relatively few have appreciated the profoundly different approach it
requires of those who must lead.
"I believe most of what Deming teaches," is commonly heard from managers.
"I agree with ten or twelve of his fourteen points." While adherence to ten or
twelve is better than none, these managers fail to see that the fourteen points are an
interdependent, integrated whole. If you pull out one row in this tapestry, it unravels.
When people reject any of Deming's teachings, it usually is point 12b: Remove barriers
that rob people in management and in engineering of their right to pride of workmanship.
This means, inter alia, abolishment of the annual or merit rating and of management by
objective.
Among Deming's Deadly Diseases is listed: "...Evaluation of performance, merit
rating or annual review." Why is performance appraisal, which often leads to some
type of merit pay increase or other reward, on Deming's list of things not to do? Why is
this time-honored American business practice seen as incompatible with total quality? And
if businesses don't conduct performance appraisals, what should they do instead?
PRINCIPLES AT THE HEART OF QUALITY
There are principles at the heart of quality that establish a foundation for
the new philosophy and, indirectly, the basis for rejecting performance appraisal. These
principles are extracted from the teachings of Deming and other originators of total
quality:
Principle 1.
The customers and their
needs shape our organization and its work, not vice versa.
* We must know what business we are in and who our customers are.
* We must know the needs and concerns of our customers. We must understand what they
experience when they apply our products and services.
* Our deep understanding of our customers guides the design of our products and
services. Consequent redesign and improvements are also responses to the customer.
* The decisions and plans we make and the improvements we introduce should be mostly
defined by the benefits that will flow to our customers.
Principle 2.
Quality products and
services result from quality systems, processes, and methods.
* The needs of the customers must be understood in terms of the systems, processes,
materials, machinery, and methods needed to consistently deliver what customers need, how
and when they need it.
* We must build quality so reliably into the system that inspection of the end product
is unnecessary.
* Exhortations, threats, pep talks, rewards, and punishments are irrelevant to the
production of quality goods and services.
* More than 95 percent of our quality problems are derived from the system. If every
worker and manager did his or her best, we would eliminate only a negligible proportion of
the current quality problems.
* Improvement efforts should focus on systems, processes, and methods, not on
individual workers. Those efforts that focus on improving the attentiveness, carefulness,
speed, etc., of individual workers -- without changing the systems, processes, and
methods -- constitute a low-yield strategy with negligible short-term results.
* Leaders must understand their systems, processes and methods in terms of capability
and variation. Data gathered on the variation of systems and processes over time will help
leaders understand the characteristics of work performance in their organization. When
managers don't understand the variation inherent in their systems and processes, they make
themselves vulnerable to some serious problems:
* They miss trends where there are trends.
* They see trends where there are none.
* They attribute to employees--individually or collectively--problems that are inherent
in the system and that will continue regardless of which employees are doing the work.
* They won't understand past performance or be able to predict future performance.
Principle 3. Quality is the
all-consuming focus of the organization.
* In the new competitive era, competitive strategy is based on quality. As described
above, this quality is defined by the customer and built into the systems.
* An organization's plans and decisions begin and end with quality. Every aspect of the
business is understood through its contribution to quality. Organizations seek to cut
costs, increase productivity, reduce prices, or increase market share. But if they do so
without first building customer-defined quality into their product/service designs and
their systems, processes, and methods, they are pursuing short-term gains instead of
long-term survival and prosperity. This is, indeed, the story of the decline of many
American businesses. Quality must become the integrating strategy of the U.S. economy if
it is to regain its ascendancy in the world market.
Principle 4. An organization
achieves quality by mastering the methods of improvement.
* It is not enough to know how to improve. The prize will go to those who have learned
to improve faster than their competitors.
* The needs for improvement are so widespread and continuous that everyone in the
organization should know the methodology of improvement and be involved in improvement
efforts.
* We must learn the difference between improvement and change. We must also learn the
difference between improvement and replacement. We must learn to start with what we have
and use logic and data to understand and improve it.
* True improvement will ultimately result only when the causes of problems, which
usually come from deep within the system, are identified and eliminated. For example,
improving Chernobyl involves more than cleanup and damage control at the site. It must
involve dealing with policies, practices, and technology in the Russian nuclear power
system that caused the Chernobyl accident and could cause other disasters like it. When we
are content with culprits, we will never look for systemic causes and the problem will be
likely to recur with a new culprit.
Principle 5. An organization
pursuing quality directs and focuses its energies.
* The leaders articulate and communicate to the organization its clear and constant
purpose, mission, values, and operating philosophy in statements that tell everyone
"who we are, what we do, how we do it" and "what legacy we leave to those
who follow."
* The operations, tasks, and methods of everyday work are no longer seen as an art
form. The single best method for doing any repeated task is established as a standard. It
is documented, taught to, and used by everyone doing that work. Attempts to find a better
method are pursued "off-line" from the daily work effort.
* We use data to identify the most critical business needs and improvement priorities.
From all the worthwhile things to do, we select only a few priorities and pursue them to
completion. We seek deep solutions to a few things rather than quick fixes to many.
Principle 6. There is a
new paradigm of leadership. Managers must reformulate what it means to lead.
* Leaders must have a customer's point of view.
* Leaders must have a systems' point of view.
* Leaders must have a statistical point of view.
* Leaders must have a worker's point of view.
WHAT IS MEANT BY PERFORMANCE APPRAISAL?
What exactly is this management intervention that undermines total
quality? It has various names: performance appraisal, performance evaluation,
performance management, and coaching and counseling, among others. No matter what
the name is, several characteristics are common to all such programs:
1. The focus is on an individual's work.
* Sometimes a team is evaluated instead of or along with the individual. Team
evaluation is not a significant improvement over individual evaluation.
2. There are expectations or standards of performance.
* The standards are usually explicit and specific, a form of performance contract for
which the employee is accountable.
* Sometimes the standards are imposed on the employee, sometimes they are negotiated,
sometimes the standards are a combination of the two. Having the standards be negotiated
does not avoid the problems of performance appraisal.
* Sometimes the measures are implicit--for example, the employee's job description.
3. There are usually two sessions between the employee
and the evaluator: one to establish the standards and another to review performance.
* The most common unit of reviewed performance is one year (the annual review).
* A six-month review is the next most common.
* In sales-dominated jobs, the period of performance is often as short as a month or a
week.
* Some organizations omit the standard-setting conference.
4. The evaluator is usually the person who has line
management authority over the one evaluated.
* Some organizations have peer review and some have a review of supervisors by
subordinates. These do not avoid the problems of performance evaluation.
5. The evaluation session usually results in some written
conclusion--some paper trail regarding the performance of the person reviewed.
* Some organizations express a specific or an overall rating with a numbered scale.
* Some use gradations of rhetoric (from "exceeds standards" to "needs
help," for example).
* Some organizations have forced ranking that requires managers to distribute the
rankings of employees to conform to some model, such as a bell-shaped distribution.
6. There are various consequences of appraisal.
* Some organizations attach merit pay or some other type of pay-for-performance
directly to the appraisal. (This includes commissions on sales.)
* When appraisal affects salary it can indirectly affect pension, if pension is
affected by salary.
* Many companies use appraisals as a basis for determining the promotability of an
employee.
* Some companies use appraisals as a basis for layoffs. IBM, for example, has used
performance appraisals as a basis for eliminating 5 percent of its work force. The
suggestion to eliminate performance appraisal often provokes an almost visceral reaction.
One manager responded to objections to performance appraisal with, "Boy! You ask
people to do a little work and they rise in rebellion." In his mind, he equated
performance appraisal with hard work. For him, the only reason someone would resist
performance appraisal would be to avoid work. Below are some important distinctions to
make when sorting out the questions and resistance related to performance appraisal. The
left-hand column represents values and methods consistent with TQM. The right-hand column
represents values and methods rooted in the old paradigm.
THE CASE AGAINST PERFORMANCE APPRAISAL
Here, then, is what is wrong with performance appraisal. In the era of total
quality, performance appraisal supports obsolete values with dysfunctional methods.
Specifically, performance appraisal
1. disregards
and, in fact, undermines, teamwork.
2. Disregards the existence of a system.
It encourages individuals to squeeze or circumvent the system for personal gain rather
than improve it for collective gain.
3. Disregards variability in the system
and, indeed, increases variability in the system.
4. Uses a measurement system that is
unreliable and inconsistent.
5. Encourages an approach to
problem-solving that is superficial and culprit-oriented.
6. Tends to establish an aggregate of
safe goals -- a ceiling of mediocrity
-- in an organization.
7. Creates losers, cynics, and wasted
human resources.
8. Seeks to provide a means to administer
multiple managerial functions (pay, promotion, feedback communications, direction-setting,
etc.), yet it is inadequate to accomplish any one of them.
Let us briefly examine each item:
1. Performance appraisal disregards and,
in fact, undermines, teamwork. Many who seem to be solo performers are actually individual
contributors to a group effort, regardless of whether that group is a formally constituted
team. When one individual's contribution is evaluated, we must pretend that we can extract
from the net outcome that specific value contributed uniquely by that person and not
attribute to him or her those contributions for which others deserve credit or discredit.
Some managers want to give recognition to each individual who participates on some
successful project team. But true teamwork usually has larger boundaries than this.
Chances are each member of that team could participate only by shifting some normal job
duties onto others who aren't on the team. Who, then, gets credit?
Performance appraisal undermines teamwork when an employee must choose between
attending to his or her individual job standards -- on which salary and promotability
often depend -- or attending to the needs of the team. In such circumstances, the team's
needs will suffer. In the spring of 1991, Gallery Furniture in Houston, Texas, eliminated
performance appraisal, quotas, and pay for performance (commissions and bonuses). All the
measures of business performance improved. But what surprised management most was the
teamwork that developed among the salespeople who previously saw each other as
competitors. The old system stifled cooperation and teamwork.
2. Performance appraisal disregards the
existence of a system. It encourages individuals to squeeze or circumvent the system for
personal gain rather than improve it for collective gain. All of us, in doing our jobs,
work within a system that consists of:
* The organization's policies and procedures that guide and constrain our work.
* Budgets and staffing that provide capability to do work and constraints on what can
be done.
* The methods for maintaining and communicating customer awareness and market
knowledge.
* Long-, medium-, and short-term plans giving direction, focus, and priority to the
organization.
* The facilities, machinery, and equipment we use and the capability and workability of
these.
* Maintenance methods and procedures.
* The materials and supplies provided for our use.
* The established methods for doing various tasks and the training provided in those
methods.
* The environment of the organization: the unwritten rules of the informal organization
that constitute the everyday workplace experience of the mass of employees (the
organization's "culture").
* The modes of communication, the accessibility of information, and the receptiveness
to feedback and suggestions.
* Every step of work that precedes the point in which we -- individually or as a group
-- get involved.
* The designs of products and services and the designing of the processes to develop
and deliver these products and services. Performance appraisal pretends that the reviewer
can discern an individual's contribution apart from all those influences contributed by
the system over which no single manager or worker has control. The parts of the system are
interdependent: If I force results here and now, I will pay a price there or later. As
Brian Joiner emphatically asserts, there are only three ways to get better numbers: (1)
improve the system, (2) distort the numbers, or (3) distort the system. Improving systems
is much too complex a matter to place on an individual's performance standard. Systems
improvement often requires a prolonged cross-functional effort involving many people and
led by top managers. Distorting the numbers, a form of creative accounting aimed at
looking good rather than doing well, is rampant in American business. Given a standard to
reduce employee turnover, one vice president of human resources simply changed the formula
for calculating turnover. This change reduced the turnover ratio while improving nothing.
Distorting the system often occurs because performance appraisal encourages individuals to
squeeze or circumvent the system for their short-term individual gain, rather than improve
it for collective long-term gain. The sales force pulls out all stops to meet one
quarter's sales quota and sales sag in the following quarter.
3. Performance disregards variability in
the system and, indeed, increases variability in the system. All the elements of a system,
such as those listed above, are subject to variation. Sometimes variation is due to
special causes. For the most part, these are unusual, infrequent events that are
relatively easy to identify and sometimes easy to eliminate. (For example, deliveries were
late last Tuesday because the truck had a flat.) This is known as special cause variation.
Most variation, however, is due to multiple unidentifiable causes. (Delivery is never at
an exactly predictable time because of many varying factors: traffic, weather, sizes of
orders, etc.) This latter type of variation is called "common cause variation."
The performance of each employee is variable and each employee works within a variable
system. Managers who don't understand variation and don't know how to use statistical
methods to plot variation will not see performance within the context of variation and
will tend to treat all unsatisfactory things as special causes attributable to individual
workers. ("Those truck drivers are always stopping for coffee. That's why deliveries
can't be predicted.")
Flight instructors in the Israeli Air Force had learned from experience that
reprimanding student pilots when their performance was poor almost always led to improved
performance. On the other hand, complimenting good performance led to deterioration of the
student's performance. A psychologist who studied this phenomenon for a year eventually
discovered that both students and instructors were inadvertently responding to variation.
When performance is at the high point in a system of common cause variation, performance
cannot help but get worse.
Similarly, performance at the low point cannot help but get better. And when does a
manager compliment or reprimand? The flight instructors' reprimands for poor performance
were the equivalent of superstition. Results are attributed to actions that, in fact, have
no influence on the outcome. ("Every time there is trouble, I do this and it
works.") Having student pilots kiss the fuselage on bad days would have worked as
well as the reprimands. Moreover, unnecessary or misguided management intervention will
usually result in increased variation.
4. Performance appraisal uses a
measurement system that is unreliable and inconsistent. Experts in metrology will tell you
that if the scales, calipers, and other devices and tests that measure the key dimensions
of products were as unstable as our instruments for measuring employee performance, we
would go out of business. There is inconsistency between the various reviewers (different
philosophies, different "calibrations"), and the same reviewer is inconsistent
from one employee to the next. A common source of measurement error is the subjective bias
of the reviewer. We are not objective in discerning our own subjectivity. Some research in
performance evaluation indicates that those who are physically attractive tend to get
higher ratings. This is not true, however, for women in management positions, who tend to
be rated lower if they are attractive. When seminar participants are asked to identify
which of several factors account most for the difference between high-rated and low-rated
employees, by far they most often cite "evaluator prejudice."
5. Performance appraisal encourages an
approach to problem-solving that is superficial and culprit-oriented. There is a Japanese
technique for problem-solving called "Ask 'Why?' Five times." For example, if
there is a puddle of oil on the shop floor,
* Why is there oil on the floor? Because the machine is dripping oil.
* Why is the machine dripping oil? Because the gasket is leaking.
* Why is the gasket leaking? Because it is made of inferior material.
* Why do we use gaskets of inferior material? Because the purchasing agent got a good
deal on them.
* Why is it important for the purchasing agent to get a good deal on gaskets? Because
his performance is evaluated on how often he can get good deals on things.
Conventional problem-solving would ask such questions as: Whose area is this? Who is
supposed to replace worn gaskets? We don't ask "why," we ask "who." We
don't look for causes in the system, we look for culprits in the work force. Performance
appraisal is a "who-based" approach to problem-solving.
6. Performance appraisal tends to
establish an aggregate of safe goals -- a ceiling of
mediocrity -- in an organization. This is a corollary to the point
made earlier regarding distorting the system. If my appraisal affects my income and career
goals, I will seek to be measured against standards that are easy to meet or exceed,
standards that are easily within the current capability of the systems within which I
work. I will pick goals that will not require me to distort the system, distort the
numbers, or improve the system. I will create the illusion of challenge around easy
targets seldom perceived by the customers as improvement. Now imagine everyone choosing
easy targets. The net result is a year without challenge. The collective rhetoric
describes highly ambitious goals, but the company and its customers don't advance at all.
Individual standards risk the twin perils of distorting the system on the one hand or
mediocrity on the other. The only legitimate alternative -- improving the system -- will
not result from so simplistic and superficial an approach as performance evaluation.
7. Performance appraisal creates losers,
cynics, and wasted human resources. Most of us believe we deserve to be rated in the top
20 percent of our organization's performers. That means 80 percent of us are in for
a hock. How will people react to the news that they are not in the upper 20 percent?
Or top one-third? Or not even above average? Some will accept the news and feel bad about
how inferior they are. Some will deny the news and attribute their low rating to a
screwed-up rating system. In either case--losers or cynics--what has the company gained?
Even those who get high ratings will suspect that they have benefited from a certain
amount of luck. Someone dealt a royal flush, however, doesn't question the legitimacy of
the deal...or the game itself. Over twenty years ago, researchers began discovering the
Pygmalion Effect in management. In his landmark study Pygmalion in Management, Dov Eden
describes the effect of self-fulfilling prophecy in work situations. Managers'
expectations of subordinates can have a powerful effect on the quality and productivity of
work.
To what extent do the expectations of a manager affect his or her evaluation of an
employee? To what extent does this evaluation communicate a manager's expectations to that
employee and, thereby, shape the employee's future performance? To what extent does his or
her perception of a subordinate's performance affect the manager's expectations and, thus,
trigger the endless cycle of self-fulfilling prophecies? None of these questions has an
unequivocal answer, but we do know that positive expectations influence managers'
perceptions and evaluations of employee behavior positively, and the negative expectations
have adverse effects. Managers engaged in performance appraisal can get trapped in the
endless negative spiral.
8. Performance appraisal seeks to provide
a means to administer multiple managerial functions, yet it is inadequate to accomplish
any one of them. We don't do anything unless we expect some benefit from it. If we
ask managers to list the various ways performance appraisal serves a useful purpose, the
response would be a long list:
* To determine pay.
* To identify candidates for promotion.
* To give employees feedback.
* To provide communications between supervisor and employee.
* To give direction and focus to employees.
* To aid in career development.
* To identify training needs.
The sheer magnitude of this list suggests that the typical four or five hours of
conference time per year between supervisor and subordinate is woefully inadequate to the
task. If managers spent 400 hours, it would still be insufficient. Performance appraisal
is a fragile cart asked to bear too heavy a load.
WHAT TO DO INSTEAD?
There are two alternatives to performance appraisal that managers don't like to hear:
1. Change the way you think.
Until managers let go of their obsession with the individual worker and understand the
importance of systems and processes, they will not enter the quality era. Without this
change in mind-set, managers will continue to look for alternatives that are no different
from what they are trying to replace.
2. Just stop doing it.
When you are doing something that is demonstrably harmful, you can stop doing it without
finding an alternative way to harm yourself. Conventional managers are, in effect, beating
their heads against the wall and asking, "If we stop beating our heads against the
wall, what will we beat our heads against?"
One way to develop alternatives to performance appraisal is by debundling.
If performance appraisal is a fragile cart asked to carry too heavy a load, we can remove
each piece of baggage and build for each a separate vehicle designed specifically for that
function. Here are some steps to take in debundling:
Acknowledge each service and expected benefit as
something important for the:
- Organization to successfully accomplish.
- Treat each as a separate function, disconnected from all the others.
- For each service and expected benefit, ask: What is the best way to successfully
accomplish this?
- Set up separate systems and processes specifically designed to successfully accomplish
that service or expected benefit.
- When identifying the services and expected benefits and designing these systems and
processes, keep in mind the principles at the heart of quality.
An example of a debundled function: giving each employee feedback on his or her
performance. Why doesn't performance appraisal adequately provide an employee with useful
feedback?
* Feedback is, by definition, something derived from one part of the system and given
to an antecedent part of the system. Performance appraisal is a feed-down activity that is
hierarchical by nature, not systemic. And the hierarchy is not ordinarily the best source
of system-focused feedback.
* Performance appraisal, particularly when tied to income and promotability, engenders
posing and pretense: easy targets, creative accounting, and evaluation that reflects the
preconceptions of the supervisor and the manipulations of the person being evaluated. All
of this works against the communication of data needed for improvement.
A better alternative is to have employees, alone or in natural work groups,
* Identify a key work process.
* Identify the customer(s) of that process.
* Learn what characteristics of the product or service -- the output of the key process
-- are most important to the customer.
* Get feedback from the customer(s) on how well these characteristics are met.
* The next step is that managers must refrain from using this data to evaluate an
employee and continue to encourage each employee to develop feedback loops such as this
for all the key tasks. The competition in the world market has forced business to
re-examine its methods of corporate leadership. We must institute managerial practices
that result in improved systems, processes, and methods that produce improved products and
services to customers. Performance appraisal is an unnecessary vestige of an out-of-date
set of managerial premises. It is irrelevant and detrimental. We can no longer afford it.
Additional Resources
Aguayo, Raphael. The American who Taught the Japanese about Quality. Carol
Publishing Group, 1990.
Brassard, Michael. The Memory Jogger Plus. Methuen, MA: GOAL/QPC, 1989.
Deming, W. Edwards. Out of the Crisis. Cambridge, MA: MIT, Center for Advanced
Engineering Study, 1986.
Eden, Dov. Pygmalion in Management. Lexington, MA: Lexington Press, 1990.
Gabor, Andrea. The Man Who Discovered Quality. NY: Times Books, 1990. Chapter 9:
The Case for a Pass-fail Approach to Evaluating Individual Performance.
Gibbs, Michael. An Economic Approach to Process in Pay and Performance Appraisals.
Harvard Business School, Working Paper 91-051, 1990. (Contact: Professor Michael Gibbs,
Harvard Business School, Humphrey 2nd Floor, Soldiers Field, Boston, MA 02163.) Gilbert,
G. Ronald and Ardel Nelson. The Pacer Share Demonstration Project: Implications for
Organizational Management and Performance Evaluation. Public Personnel Management, Vol.
18, No. 2. Summer 1989.
Graves, Spencer B. Compensation Systems and Other Human Resources Policies to Promote
Quality and Productivity Improvement. International Productivity Journal, SGA
Report 91-4, 13 July 1992.
Haller, Harold and Bradley J. Whittaker. Barriers to Change: Does the Performance
Appraisal System Serve a Logical Purpose? Cleveland, OH: Statistical Studies
Incorporated, 1987. (Contact: SSI Management, Attn: Carol Halter, 24803 Detroit Road,
Cleveland, OH 44145, !216^ 871-6597, Fax: !216^ 871-1182.)
Herzberg, Frederick. One More Time: How do you Motivate Employees? Harvard Business
Review, September-October 1987 (pp. 109-120).
Hitchcock, Darcy. Performance Management for Teams--A Better Way. Journal for Quality
and Participation, September 1990.
Huber, Vandra. Comparison of the Effects of Specific and General Performance Standards
on Performance Appraisal Decisions. Decision Science, Vol. 20, 1989 (pp. 545-557).
Kane, Jeffrey and Kimberly Freeman. MBO and Performance Appraisal: A Mixture That's Not
a Solution. Personnel, Part 1, 1986 (pp. 26-36), Part 2, 1987 (pp. 26-32).
Kohn, Alfie. No Contest. Boston, MA: Houghton Mifflin, 1986.
Kume, Hitoshi. Statistical Methods for Quality Improvement. Tokyo: The
Association for Overseas Technical Scholarship, 1985. (Available through: UNIPUB, One
Water Street, White Plains, NY 10601, !800^247-8519.) Perhaps the best book on statistics
for manufacturing processes. Skip the parts on testing hypotheses (esp. Ch. 9).
McLean, Gary, Susan Damme and Richard Swanson. Performance Appraisal: Perspectives
on a Quality Management Approach. Alexandria, VA: American Society for Training and
Development, 1990.
Orsini, Joyce Nilsson. Bonuses: What is the Impact? National Productivity Review,
Spring 1987 (pp. 180-184).
Scholtes, Peter R. An Elaboration on Deming's Teachings on Performance Appraisal.
Madison, WI: Joiner Associates Inc., 1987. (To order, contact: Joiner Associates Inc., PO
Box 5445, Madison, WI 53705 !800^ 669-8326.)
Scholtes, Peter R. The Team Handbook. Madison, WI: Joiner Associates Inc., 1988.
Walton, Mary. Deming Management at Work. New York: Putnam, 1990. Chapter 8:
Doing Without Performance Appraisals.
Walton, Mary. The Deming Management Method. New York: Putnam Publishing, 1986.
(Order from: Putnam Publishing, Telephone Sales, ISBN 399-55000-3, !800^ 847-5515.) A
good, easy-to-read starting point.
Peter R. Scholtes is a senior consultant with Joiner Associates Inc., of Madison,
Wisconsin. He is a well-known writer and speaker on total quality and the principal author
of The Team Handbook.
|